Challenge
A large retailer with more than 2,400 stores, needed a fully integrated artwork management solution to fit into their existing infrastructure in order better connect product and packaging development.
The incumbent stand-alone artwork management solution had been in place for more than 15 years. Our client wanted to gain efficiencies by integrating with their PLM, and had designed hundreds of user requirements needed for a newly integrated system.
What we did
We recommended a phased approach, with e-flow’s flexible workflows initially simulating the previous processes to help with user adoption and familiarity. As experience with e-flow grew, the client required additional functionality, which was implemented through phased delivery using agile project management methodologies.
Results
In just 3 months, e-flow was fully operational and integrated with no disruption to business. Additional functionality answering the majority of the original user requirements was completed within 12 months, resulting in a reduction of more than 3 weeks from the average critical path.